Inside Vantec

A Vantec plastic injection molding team in the boardroomManufacturing Management Systems

  • Quality First
  • Attention to Detail
  • Project Management
  • Time-to-Market Focused
  • Inventory Management

Top of the line custom injection molding technologyEngineering Support

  • Concept to Development Support
  • Plastics Design Experience
  • Metal to Plastic Conversion
  • Access to Multiple Prototyping Methods
  • Competitive Tooling Partners
  • Value Added Analysis

The Vantec plastic molding team environmentTeam Environment

Our people are what set Vantec apart from other molding companies and why we can consistently deliver quality products at competitive prices.

  • Collaborative Cells within the plant drive employee involvement and consensus
  • Clean and well organized facility for maximum efficiency
  • Continuous Improvement Coordinator supports teams in driving out waste
  • Communication is a key factor throughout the entire organization

Our superior plastic molded parts technologyQuality Focused

  • ISO 9001:2000 Certified
  • Advanced Inspection Equipment to ensure quality
  • Process Quality verified at defined frequencies
  • Compliant with NSF and UL requirements

Our state-of-the-art custom molded parts facilityOur Facility is an Investment in the Future

  • 145,000 sq. ft. on over 11 acres
  • 11 shipping/receiving docks
  • Space Capacity for up to 3000 Ton Presses
  • Logistically located on major transportation routes
  • Assembly and secondary operations

Our state-of-the-art plastic injection molding facilityState-of-the-Art Injection Molding Facility

  • Climate controlled environment for process optimization
  • Positive air pressure maintained for reduced contamination
  • Real-time monitoring of processing parameters
  • Robotics and automation to achieve reliable, repeatable processes

Dynamic Support Systems

  • Auxiliary equipment located on the lower level to reduce noise and contamination
  • Cells on the molding floor are supported by a flexible cell on the lower level
  • Automated material handling system for precise and consistent material blending, reducing cost and improving quality
  • Mold storage in a safe, secure, climate-controlled system extends tool life and reduces maintenance